Validate planned mix/depth suitability, then model protected reserve and turn pressure for the profile.
Set mix, depth, and PPO2 thresholds
Using: Twinset 2x12L
Backgas 24.0L @ 232 bar
Stages 0 • Planned gas 5568L
Canonical standard gases come from core. Custom mixes can be fully allowed, warned, or blocked by policy.
Planned gas suitability and protected reserve outputs
Enter values and calculate to view results
Use the current reserve strategy to identify the limiting diver and a team turn trigger.
Build a draft profile with segment rows and planned switches. This phase validates structure only.
Current JSON/print actions still apply to Gas Envelope only. Use this editor to shape the advanced draft before calculation logic lands in a later milestone.
Load a realistic starting structure, then adjust it to match the actual dive. These templates seed rows only; they do not replace final reserve or deco-planning checks.
Save named draft setups in this browser so you can reuse recurring profile scaffolds without rebuilding the row model each time.
No saved drafts yet in this browser.
Seed the primary backgas from the current envelope, then add stage/deco/travel sources for the draft.
Define the sequence you want to validate. Depth and duration are draft inputs only in this phase.
The draft structure is internally consistent. Advanced runtime calculations and exports are still deferred.
Structural preview only. It summarizes the current row model without running decompression or final gas-budget math.
RT 20 min | Max 40 m | No switches yet
Structural preview only. Confirm reserve, turn, and final wet notes from the live planning modes until advanced calculations ship.
This uses a single planning RMV with the current advanced draft rows. It is advisory only: primary protected reserve stays anchored to the live Gas Envelope reserve (70.0 bar).
Total modeled burn: 2000 L at 20.0 L/min RMV.
Primary backgas projected end pressure: 116.7 bar (above reserve anchor).